Energy 
The Weidt Group Energy

The Weidt Group » Energy » Projects » LEED® » Case Studies » MEEA Office Suite
Email this Page Printer-friendly version Bookmark this page

Projects
LEED® 
Certified Projects 
Registered Projects 
Case Studies 
St. Mary's Duluth Clinic First Street Building 
Speculative Office Building 
Van Allen Elementary School 
Wisconsin DNR Northeast Regional Headquarters 
U.S. DOT Office Building 
Pharmacia Laboratory Facility 
MEEA Office Suite 
Utility Program Projects 
Selected Projects 
Research 
Photo by Powell/Kleinschmidt
Highslide JS
Photo © Powell/Kleinschmidt

Highslide JS
Midwest Energy Efficiency Alliance Office Suite
Chicago, Illinois
Powell/Kleinschmidt Architects
LEED® -CI

This project is a relocation of MEEA's offices into 3,815 sf of an existing building on Michigan Avenue in downtown Chicago. Completed in July 2006, the facility has achieved LEED-CI 2.0 Certification by the U.S. Green Building Council, receiving a total of 24 points. The Weidt Group's work included support in the LEED decision-making process, input into the lighting and daylighting control systems, and fundamental commissioning. The Weidt Group completed and documented the LEED-CI Fundamental Commissioning Prerequisite, the Minimum Energy Performance Prerequisite, and Optimize Energy Performance Credits for Lighting Power and for Lighting Controls. The energy outcome for lighting, as shown by the lighting power density, is 29% better than the LEED baseline of ASHRAE 90.1-2004.

Key Strategies
  • Occupancy sensor control of lighting in various spaces
  • Direct/indirect lighting systems with T8 lamps
  • Dimming daylighting control of lighting in open offices